David Lloyd Chigwell - Gym strip back & refurbishment

As part of a significant £4 million investment programme LGCS was appointed to strip back and refurbish the main gym, toilets and changing facilities to include the shower block.

Our team started by running structural investigations, then moved onto stripping out the suspended ceilings.

We removed the redundant partition walls, pulled up the flooring, took down the existing kitchen and carried out minor building repairs. Once the space had been taken back to a shell, we were able to get started on design and installation elements. The team worked on fire compartmentation of the rooms and ceiling, then installed mechanical and electrical features such as LED lighting, air conditioning and ventilation.

  • Strip Out & Excavation Works
  • МEP
  • Partitions & Ceilings
  • Joinery, Flooring & Doors
  • Sanitary Ware
  • Painting, Decoration & FF&E

Project Value – £470,000.00